Reading your result
What your perc rate means
The gauge converts your drop time (T, minutes per inch) into a design loading rate with 1.2 ÷ √T gal/ft²/day, then classifies the soil. Faster soil — a lower T — carries more wastewater per square foot, so it needs a smaller field; slower soil needs a bigger one, and past about 60 min/in a conventional gravity field usually won't pass. Feed the number straight into the drain field calculator to size the field.
How to calculate the percolation rate from your readings
The test sheet gives you a drop in inches over a timed interval, not minutes per inch. The percolation rate formula is simply T = minutes ÷ inches of drop. The classic falling-head procedure pre-soaks the holes, then reads the water level every 30 minutes until two consecutive readings agree (fast soils that drain the first 6 inches in under half an hour are read at 10-minute intervals instead). Convert the last stabilised reading of each hole:
| Drop in 30 min | Perc rate | Reads as |
|---|---|---|
| 6 in | 30 ÷ 6 = 5 min/in | Rapid |
| 3 in | 30 ÷ 3 = 10 min/in | Suitable |
| 2 in | 30 ÷ 2 = 15 min/in | Suitable |
| 1 in | 30 ÷ 1 = 30 min/in | Suitable |
| ¾ in | 30 ÷ 0.75 = 40 min/in | Slow |
| ½ in | 30 ÷ 0.5 = 60 min/in | Slow |
| ¼ in | 30 ÷ 0.25 = 120 min/in | Unsuitable |
Whether you average the holes or design to the slowest one is set by your health department — check before you enter a single number above.
Typical perc rate by soil type
If you haven't had a test done yet, the soil texture on your lot gives you a rough expectation to plan against. These are the defaults the calculator uses when you pick a soil type instead of entering a measured number — treat them as a starting point, not a substitute for the real test:
| Soil texture | Typical perc rate | What it means |
|---|---|---|
| Sand | ~5 min/in | Pretreatment likely |
| Sandy Loam | ~15 min/in | Standard field OK |
| Loam | ~30 min/in | Standard field OK |
| Clay Loam | ~45 min/in | Oversize the field |
| Clay | ~90 min/in | Engineered system |
Real lots vary widely inside a texture class — a clay loam with good structure can outperform a compacted sandy loam.
Percolation test results table: loading rate and field size
Slow soil doesn't just fail or pass — it scales the drain field. The table below runs each perc rate through the same sizing the drain field size calculator uses: 150 gal per bedroom per day of design flow (the figure most state codes adopt), primary absorption area only, before the 100% reserve area most codes also require.
| Perc rate | Soil class | Loading rate | 3-bed field (450 GPD) | 4-bed field (600 GPD) |
|---|---|---|---|---|
| 1 min/in | Rapid (sandy) | 1.200 gpd/ft² | 375 ft² | 500 ft² |
| 5 min/in | Rapid (sandy) | 0.537 gpd/ft² | 839 ft² | 1,118 ft² |
| 10 min/in | Loam — ideal | 0.379 gpd/ft² | 1,186 ft² | 1,581 ft² |
| 15 min/in | Loam — ideal | 0.310 gpd/ft² | 1,452 ft² | 1,936 ft² |
| 20 min/in | Loam — ideal | 0.268 gpd/ft² | 1,677 ft² | 2,236 ft² |
| 30 min/in | Loam — ideal | 0.219 gpd/ft² | 2,054 ft² | 2,739 ft² |
| 45 min/in | Clay loam | 0.179 gpd/ft² | 2,516 ft² | 3,354 ft² |
| 60 min/in | Clay loam | 0.155 gpd/ft² | 2,905 ft² | 3,873 ft² |
| 90 min/in | Heavy clay | 0.126 gpd/ft² | — (engineered) | — (engineered) |
Because the loading rate falls with the square root of T, a 60 min/in lot needs about 2.4× the absorption area of a 10 min/in lot for the same house — which is why a slow result raises the excavation and materials bill long before it forces an alternative system. Many state codes publish a step table of loading rates by perc-rate band instead of a continuous formula; where your code's table differs, the code governs the permitted design. For trench length and the reserve area, run your number through the drain field calculator.
What the perc rate doesn't tell you
The drop time is only one of the findings that decide your system. A site can perc beautifully and still fail on depth to bedrock, seasonal high water table, slope, or setback distance from a well or property line — all of which are logged in the same soil evaluation. Several states have gone further and dropped the timed test as the deciding measurement: North Carolina assigns a Long-Term Acceptance Rate from soil morphology, and Wisconsin requires a full soil and site evaluation by a Certified Soil Tester rather than a perc test at all. Check what your own state actually requires on the septic cost and rules by state pages before you book anything.
Full guide: Reading your perc test results → — how to run a falling-head test, what each soil class means, and what to do with slow soil.
Frequently asked questions
What is a good perc rate for a septic system?
The ideal range is roughly 5–30 minutes per inch. Faster than 5 min/in drains so quickly it may not filter effluent; slower than 60 min/in is generally unsuitable for a conventional drain field and needs an alternative system.
How do you do a percolation test?
Dig test holes to the proposed trench depth, pre-soak them, then fill with water and time how long the level takes to drop one inch. Average several holes. Most jurisdictions require a licensed evaluator to perform or witness the test.
How do you calculate the percolation rate from your readings?
Divide the elapsed minutes by the inches the water fell: perc rate (min/in) = minutes ÷ inches of drop. If the level fell 1½ inches during a 30-minute reading, that is 30 ÷ 1.5 = 20 min/in. Use the final, stabilised reading of each hole, not the first one — the early readings run fast while the soil is still wetting. Codes differ on whether you then average the holes or design to the slowest one, so follow the rule your health department publishes.
What does minutes per inch mean?
It is the time for water in a saturated test hole to fall one inch. A lower number means faster-draining soil. The figure converts to a design loading rate (gallons per square foot per day) that sizes the drain field.
What if my perc rate is too slow?
Above about 60 min/in, a conventional gravity field will not treat wastewater fast enough. You will likely need a mound, sand filter, or aerobic treatment unit — an engineered design.
Does the perc test determine the septic tank size?
No. The tank is sized from bedrooms (the design flow) under your state code, and the perc rate does not change it. What the perc rate sizes is the drain field, through the soil loading rate. So a "perc test for a septic tank" is really a perc test for the tank's drain field — size the tank separately with the septic tank size calculator.
How much does a perc test cost?
A percolation test typically runs about $150–$1,500, depending on your area, how many test holes the health department requires, and whether an engineer or soil scientist has to witness it. Rural sites with easy access are cheapest; multiple deep holes on a difficult lot cost the most. The test is separate from the septic design and permit fees.
How is the loading rate calculated?
We use the standard relation loadingRate = 1.2 ÷ √T, where T is the perc rate in minutes per inch. The drain field area is then the daily design flow divided by that loading rate.
Is a UK soakaway percolation test (Vp) the same measurement?
Same idea, different units. The UK method (BS 6297 and Building Regulations Approved Document H) reports Vp in seconds per millimetre of drop. To convert, multiply minutes per inch by 60 and divide by 25.4: 20 min/in ≈ 47 s/mm, and the UK acceptable band of roughly 12–100 s/mm corresponds to about 5–42 min/in. This calculator is built on US codes, so use it for the conversion, not for a UK drainage-field design.
How long does a perc test take, and when do you get results?
The field work usually takes a couple of hours plus the pre-soak — many jurisdictions require soaking the holes for several hours or overnight before timing. The evaluator often knows the rate on site the same day, but the written report the health department accepts typically follows in a few days to two weeks.
What does "perc tested" mean in a real-estate listing?
It means a percolation test has been run on the lot and the soil passed for a septic system — usually a conventional one — so the land can be built on without a sewer connection. Ask for the actual report: the approved rate, the test date, and where the holes were dug, because many counties treat a perc result as valid only for a limited period and for the specific area tested. A lot that "won't perc" may still be buildable with an engineered system, at a higher cost.
Is it a perc test or a perk test?
Both spellings are used, but it is short for percolation test, so "perc test" is the standard form — that is what health departments and septic codes write. A "perk test" is the same thing.
Sources & methodology
- Soil loading rate from percolation rate (1.2 ÷ √T) — EPA / Wisconsin onsite design model
- US EPA — Onsite Wastewater Treatment Systems Manual (EPA/625/R-00/008): 60 gal/person/day design flow
- Your state or county health department — the authoritative source for local code, minimums, setbacks, and permits
Estimates compiled from the sources above and standard engineering formulas — not engineering, professional, or legal advice, and may not reflect your local code. See our full methodology and disclaimer.